Phase 1 – New Headworks
Size
8 MGD
Funding
IL DCEO/CDAP Grant
IEPA SRF Low Interest
Loan $3.2 Million
IEPA SRF Debt
Forgiveness $1.5 Million
Cost
$4.7 Million
Client
Beardstown Sanitary District – Beardstown, Illinois
Phase 1 – New Headworks
8 MGD
IL DCEO/CDAP Grant
IEPA SRF Low Interest
Loan $3.2 Million
IEPA SRF Debt
Forgiveness $1.5 Million
$4.7 Million
Beardstown Sanitary District – Beardstown, Illinois
IPEA SRF Low Interest Loan
DCEO/CDAP Grants
Tank – $2,345,000
Transmission Mains – $607,239
City of Beardstown, Illinois
1.5 MG water storage tank
16,000 LF of 16″ dia. Ductile Iron water main
3,700 LF of 10″ dia. PVC water main
SCADA system consisting of 9 remote sites and the WTP
IPEA
Loan/Principal Forgivness
Electrical: $380,000
Construction: $4,138,729
City of Taylorville, Illinois
Structural and civil/site services for converting an abandoned factory into a new facility for McDonough County Public Transportation.
65,000 SF
Various Federal Grants, ARRA
$13.6 Million
McDonough County Public Transportation
Water Treatment upgrades included 2 – 100,000 gallon glass-fused-to-steel finished water storage tanks, a new 800 square foot treatment plant building, site improvements including a retaining wall, and a variety of electrical and control modifications.
IEPA SRF
$1.2 million principal forgiveness
1% low interest loan
$1.6 Million
Town of Astoria, Illinois
Phase 2 – 8 MGD Secondary Treatment System upgrade and sludge management
8 MGD
IL DCEO Design Grant – $100,000
USDA-RD Grant – $4,267,000
USDA-RD Loan – $8,720,000
$13,087,000
Beardstown Sanitary District – Beardstown, Illinois
The City of Taylorville provides water treatment and distribution to the residents of Taylorville as well as five regional customers. The City’s water supply consists of both surface water (lake) and groundwater (wells) which are blended prior to treatment. Aging facilities and changing regulations on contaminants such as cryptosporidium and nitrate required additional treatment to maintain regulatory compliance to the facility which hasn’t had significant upgrades or improvements since 1983.
The City selected Benton & Associates, Inc. to complete a Facility Plan for the source water and treatment evaluation which looked at renovating the existing facilities or constructing a new facility at a new location. After consideration of capital costs along with Operation and Maintenance Costs, the City council voted to build a new 5.2 MGD lime softening blended water treatment plant at a new location. The new facility features upflow solids contact clarifiers for clarification and softening, gravity sand filtation, and Ultra-Violet (UV) disinfection reactors for inactivation of cryptosporidium and giardia.
The new plant also employed the latest in biological Nitrate removal technology (Biottta – AdEdge Water Technologies) which converts groundwater nitrate into harmless nitrogen gas leaving a safe waste stream discharged to a nearby stream. This is the first biological nitrate removal system in Illinois and the third of its kind in the nation.
5.2 MGD
$28,000,000
City of Taylorville, Illinois
9 MGD
IEPA Low Interest Loan
DCEO Grant $1,000,000
EDPA Principal
Forgiveness $3,000,000
$37,200,000
2+ years
City of Jacksonville