Taylorville Lift Station

Taylorville Lift Station Improvements

Improvements consisted of the upgrade/rehabilitation of nine (9) lift stations. B&A provided on-site construction observation; project shop drawing review; and construction contract management and documentation, including review of pay estimates and change orders in accordance with City and Illinois EPA-SRF Standards and Practices.

Funding

IL DCEO/CDAP grant
IEPA SRF low interest loan
USDA-RD loan

Cost

$1,450,000

Client

City of Taylorville, Illinois

Unionville Sewer

Unionville Sewer Collection System Improvements

Assistance in annual reporting to MoDNR to identify and mitigate sources of inflow and infiltration to the wastewater collection system. Recommendations included manhole rehabilitation, sewer main replacement, sewer main lining, and construction of a relief sewer.

Funding

MoDNR CWSRF Grant – $777,000
MoDNR CWSRF low interest loan- $777,000
CDBG Grant – $500,000

Cost

$1,900,000

Client

City of Unionville, Missouri

Chapin WWTP

Chapin WWTP Improvements

Removal of all lagoon and sand filter sludge, replacement of the existing aeration system with a new fine bubble easily cleaned and maintained system.

Funding

DCEO Grant – $483,600

Cost

$553,100

Client

Village of Chapin, Illinois

Brasher Wastewater

Brashear WWTP Improvements

  • Sludge removal from existing lagoon
  • Increase in storage capacity
  • Conversion to Fixed Head Spray Irrigation system
  • Eliminated the existing NPDES permit requirements for effluent disinfection and the anticipated requirement for ammonia removal.

Funding

$150,000 CDBG Grant
$660,000 MDNR SRF Grant
$485,000 MDNR SRF Loan

Cost

$1,295,000

Client

City of Brashear, Missouri
Macon WW

Macon Wastewater

Development of a Facility Plan to address the disinfection of the wastewater treatment facility. 

Funding

MoDNR SRF Low Interest Loan

Cost

$980,000

Client

City of Macon, Missouri

Beardstown WWTP Phase 1

Beardstown WWTP Improvements

Phase 1 – New Headworks

Size

8 MGD

Funding

IL DCEO/CDAP Grant
IEPA SRF Low Interest
Loan $3.2 Million
IEPA SRF Debt
Forgiveness $1.5 Million

Cost

$4.7 Million

Client

Beardstown Sanitary District – Beardstown, Illinois

Colchester WWTP

Colchester Wastewater

  • Lagoon modifications
  • New treatment system
  • Collection system rehabilitation
  • New storm sewer

Size

0.17 MGD

Funding

USDA-RD Public Infrastructure
40% Grant, 60% Low Interest

Cost

$1,982,000 – Wastewater Treatment Plant
$1,558,000 – Collection System

Client

City of Colchester, Illinois

Industry WWTP

Industry WWTP Improvements

  • Lagoon modifications
  • New treatment system
  • Collection system I/I reduction

Size

75,000 gpd

Funding

Illinois EPA SRF
35% Principal Forgiveness, 65% Low Interest Loan

Cost

$1,900,000

Client

Village of Industry, Illinois

South Oldham WWTP

South Oldham Wastewater

Size

4 MGD

Funding

Kentucky Infrastructure Authority (KIA)

Cost

$11 Million

Client

Oldham County Environmental Authority (OCEA) – Oldham County, Kentucky